Week 2: Introduction

In today's meeting, we met with Dr. Furman and Eric at our respective facility near campus. At the facility, we were introduced to the 1/12th, 1/2 and full scale model of the Spartan Superway. Dr. Furman and Eric assigned everyone to their respective groups. I have been assigned to work on the controls system of the full scale model for the Spartan Superway with Cheuk Kwan. We plan on getting in contact with the prior Full-Scale Team and reading last year's archives to be up to date with the project and smoothly transition into forwarding the team's agenda. For Cheuk and I, we will be concentrating on using a micro-controller to drive and control the bogey motor drivers and sensors to designate the pod to travel safely from one destination to another. Additionally, we plan on setting up our sub-team's blog and researching more about controls systems.

Comments

Popular posts from this blog

Week 3: Lightening Talk

Week 7 (Spring 2018): Component Box for Full Scale Controls System